Sino-Myanmar Railway Project(Ruili of China to Kyaukpyu of Myanmar section of railway project: Kyaukpyu Terminal Project)

ino-Myanmar Railway Project(Ruili of China to Kyaukpyu of Myanmar section of railway project: Kyaukpyu Terminal Project)

Phase 1 scale of the project includes three 40,000DWT cargo berth as well as they are designed as 50,000DWT bulk carrier berths and two 100,000DWT container berths. The total shoreline length is 1,475m, covering an area of about 148 hectares. The design handling capacity consists of 2.5Mtpa bulk cargo, 910,000 TEUs and 3Mtpa groceries. The total investment of Phase 1 is about 8.54 billion.

The future plan includes three 40,000DWT groceries berths, three 100,000DWT container berths, two 100,000 bulk cargo berths. The total shoreline length is around 2378, covering an area of about 240 hectares. The design handling capacity among the harbor area: 11.35Mtpa bulk cargo, 2055,000 TEUs and 3.83Mtpa groceries.