联系我们-腾龙娱乐游戏有限公司19038888885-在线客服 <br />

Guangdong Nangang new ferry Ferry Terminal Engineering

The newly Ferry Terminal project in south port area of Yuehai ferry port, the total length of berth is 208m, the construction structure is complied with plane pile type and high pile dolphin type. The length of plane pile berth is 57m, part of dolphin berth has three breast dolphin and two mooring dolphin, the area of  rear landside is 16,000m2. the total investment is CNY 82 million.

 


[Return]